Floats on the safety rope should not be spaced anymore than 5' apart.
2.0
16.
Several sections of fence that is chainlink is over 2 1/4" wide. suggest replacing with compliant fence. At entrance, section of fence had over 2" between ground and bottom of fence-operator repaired by placing a board to seal gap.
4.0
25.
Should have a separate locked chemical storage room with ventilation.
2.0
General Comments
Deck around brick edging around pool is starting to offset- Monitor as you cannot have an offset any greater 1/2 inch.
Provide depth marking on vertical wall where 3ft tile was added at steps or add marking on fence outside of pool. CDI Added on fence.
4.0
10.
Provide safety rope and floats at break point to deep end.
2.0
16.
Two panels of fence at the service gate has links greater than 2 1/4 inche. Gates had spots where height was greater than 2 inches from grade. Gate was lowered at one gate; dirt added at other to close gap to 2 inches or less. CDI
4.0
25.
Store chemicals in separate room from pump room.
2.0
29.
Water greater than 110F in bath. Take mirror down or use shatterproof.
Some depth markers and no diving markers were less than 4 inches. Some vertical depth markers were not visible. CDI markers painted to 4 inches and vertical depth markers put up on fence.
4.0
10.
Safety rope at the 5ft transition needed.
2.0
16.
Two sections of fence at the service gate has links greater than 2 1/4"
4.0
18.
Warning No Lifegaurd On Duty sign was not in 4 inch letters. CDI letters drawn/painted to at least 4 inches.
4.0
24.
Flow meter was stuck. CDI Flow meter cleaned for the weight dial to oscillate.
4.0
25.
Some chemicals were stored in pump room and some in an outdoor container. Store chemicals seperate from pump room and in dry places.
2.0
28.
Need shower and restrooms within 300 ft.
2.0
General Comments
7. Pool Floors will need to be refinished by next pool season. 13. Contrasting band on steps will need to be refinished by next pool season. 16. Window from club house were screwed in from the inside so that they will not open. Ring buoy rope must be 42 ft long. Memo on electrical safety told to operator. Suggest having the entire electrical system inspected by a licensed electrician. Permit Issued.
some depth markers and no diving markers were not 4 inches tall. Owner repainted over the shorter markers. Depth markers on step end was more than 25 feet apart. Owner painted new 3FT marker. Owner corrected.
4.0
16.
Two sections of fence at the service gate has links that are greater than 2 1/2 inches.
4.0
25.
Some chemicals were stored in pump room and some in an outdoor container. Store chemical separate from pump room and in dry places.
2.0
28.
Need shower and restrooms.
2.0
General Comments
Rope to ring buoy must be 42 feet long. Because phone is with cellular service, wordage stating tell 911 your location is needed.
Mesh o 2 sections of chainlink fence are wider than the required 2 1/4".
4.0
25.
Should have a separate chemical storage room.
2.0
28.
Should have restrooms and shower available o pool deck or within 300 feet of pool entrance. Should have a sign instructing bathers to shower before swimming.